Marstons Mills Village Center Improvements
Client:
Town of Barnstable
Barnstable
MA
New England
PROJECT MANAGEMENT
SERVICES
Highways, Streets & Structures
Traffic & Parking
Community Transportation
PROJECT ELEMENTS
Safety analysis
Traffic data collection & analysis
Traffic calming
Parking
Lighting design
Pedestrian & bicycle accommodation
Development of conceptual intersection & roadway improvements
Pavement design
Conceptual design report
Public outreach
Construction plans & contract documents
Construction bidding
RFIs
Shop drawing plans
Contract documents
Construction observation
Construction administration
Robert Smith, P.E.
McMahon was retained by the Town of Barnstable to design intersection and roadway improvement plans for Marstons Mills Village Center along the Cotuit Road (Route 149) corridor. The primary goal of the project was to develop a constructible concept for the Cotuit Road/Main Street/River Road skewed intersection, while implementing pedestrian, bicycle, and on-street parking improvements along Cotuit Road.
Using Chapter 90 funds, the project design included traffic calming elements, aimed at changing the street atmosphere and enhancing the Village Center. The recommended design included realignment of the subject intersection to a four-legged platform intersection, drainage/stormwater improvements, parking modifications including the provision of on-street parking, raised and midblock crosswalks, curb extensions, landscape/streetscape enhancements, pavement design, and sidewalk installation, including a boardwalk sidewalk at Mill Pond.
McMahon was responsible for preparing construction plans and contract documents. Throughout the project, McMahon conducted a public outreach process, which included public meetings and meetings with town officials and the local Village Association.